Investor projects fail on budget for predictable reasons: the scope was never written down, the contingency was too thin, or the holding costs of an overrunning programme were never counted.
Build the budget from a scope
Start with a written scope of works room by room. Price against that scope. Anything not in the scope is a variation, and variations should be priced and agreed before they are carried out.
Line items investors often miss
- Strip-out, skips and waste removal
- Making good after structural or services work
- Certification and testing
- Final clean and snagging
- Holding costs — finance, council tax, insurance and utilities during works
- Contingency for unforeseen conditions behind walls and under floors
Control the variables you can
Fix the specification early, order long-lead items up front, and use one contractor with responsibility for the whole programme so no trade is waiting on another to finish.